Week 74  This week we get another set of brass bulkheads

The bits we received

And what we did with them

This is a virtual repeat of week 72.  The main brass part was curved using my usual method of rolling it on a rubber mat with a metal rod.  Then it was glued and clamped, using 24 hour Araldite.

The next job was to add the vent covers and ladders to the remaining brass bulkheads.  I used the supplementary pieces for the aft bulkhead as mentioned in the insert.

This week was then left until after week 75 was completed, the same as I did in week 72.

After week 75, I added the plain brass bulkhead, using 90 second Araldite.  Kilroy (who finally showed up for work after a somewhat extended break) held it in place while the glue cured.

Then the detailed bulkhead was glued on top.

Finally the aft bulkhead was glued in place.  

Things not yet done

Fitting the fore deck
Fixing deck
Fit the bilge keels
Fit sea chest grills
Fit the resin bow piece
Week 54
Fit bulkheads in week 61
Week 64.  Glue platform in place
Week 65 : Done
Anti aircraft bridge in week 67
Week 68
Modify wind speed and direction indicators in week 71
Fit remaining bulkhead from week 72 : Done
Part 573 from week 73

Hot tip of the week

It's hardly worth straightening the handrails that get bent while handling.  Chances are they will only get bent again.  Wait until the model is almost finished, then have a mammoth straightening session prior to painting.

How many hours does it take to build the model ??

This week :

3 hrs

Running total :

hrs

Take me back to week 73

Take me to week 75