Week 45  This week we get some decks

The bits we received

And what we did with them

The forward deck went on first, which was very straight forward.

The larger deck was not quite so straight forward.  I thought that the deck was a bit unsupported inboard between the two gun positions, so I added a small support.  This is simply an off cut of deck planking, cut to the same height as the ply part outboard.

I also found that the plastic ledge below was a little too low, so I added a scrap of plank bring it up to the right height.  The plank was actually a bit too thick at 1mm.  It only needed about 0.5mm.  Nothing a rub with sand paper didn't sort out.  I measure parts like this with a vernier caliper, which is quick, easy and accurate.

Finally the deck was glued on carefully, making sure that it is square.  I used Araldite for this as is glues onto plastic in some places.

The other two bits were put away safely for 'Ron

Things not yet done

Fitting the fore deck
Stern deck part 63 not fitted.
Fixing deck
Fitting resin stern part 70
Fitting resin propshaft part D
Fit the bilge keels
Fit the resin bow

Hot tip of the week

Araldite glues plastic to wood very strongly.

How many hours does it take to build the model ??

This week :

2 hrs

Running total :

183 hrs

Take me back to week 44

Take me to week 46